Fore Thinking
Search
Recent News
- Scaffsystem and Mechano steel structures with low environmental impact for a new generation eco-sustainable building and the EPD ISO 14025 environmental product declaration
- Environmental impact assessment: Industrial Design LAB Srl also relies on the Forethinking© Method
- Green claims: new criteria to prevent companies from making false claims about the environmental merits of their products and services
Industrial Design LAB Srl relies on the Forethinking© Method for the environmental impact assessment of the new T-Box toolbox (registered patent) designed as an accessory for motorcycles.
The environmental impact assessment of the system and components, carried out with the Life Cycle Assessment ISO 14044 methodology, was carried out by Forethinking with the support of the LCA SimaPro software and the use of the Ecoinvent 3.9 database.
The program is one of the “trajectory projects”, assisted by the Forethinking accelerator for research and development, for a clear positioning of Industrial Design LAB Srl in the direction of the global green deal, an example for all companies in the automotive sector.
#ricerca #LCA